Company: Meta (through TEKsystems)
Title: Connectivity Quality Manager
Location: Aiken, SC
Onsite: 100%
Job Type: W2 Contract
Duration: 24+ months
Start Date: August 2026
Pay Rate: Based on experience listed below
Top Required Skills
1) 5-10+ years of field auditing, validation, and quality/Cx experience
2) QC of telecom, ISP, cabling, and fiber network inside of data center environments
3) Quality process as part of a large-scale construction project
About the Role
Meta is seeking a Connectivity Engineer focused on Data Center Commissioning and Auditing to ensure network and connectivity infrastructure is installed, tested, validated, and production‑ready prior to handoff to operations. This role is embedded in the late construction and commissioning phase, serving as a technical authority for connectivity quality, compliance, and readiness.
Connectivity Engineers in this role work on‑site alongside construction, commissioning, and operations readiness teams to verify that fiber, structured cabling, and connectivity systems meet Meta standards, specifications, and performance expectations before go‑live.
Responsibilities
Minimum Qualifications
Preferred Qualifications
This is a Contract position based out of Aiken, SC.
Pay and BenefitsThe pay range for this position is $60.00 - $80.00/hr.
Eligibility requirements apply to some benefits and may depend on your job classification and length of employment. Benefits are subject to change and may be subject to specific elections, plan, or program terms. If eligible, the benefits available for this temporary role may include the following: • Medical, dental & vision • Critical Illness, Accident, and Hospital • 401(k) Retirement Plan – Pre-tax and Roth post-tax contributions available • Life Insurance (Voluntary Life & AD&D for the employee and dependents) • Short and long-term disability • Health Spending Account (HSA) • Transportation benefits • Employee Assistance Program • Time Off/Leave (PTO, Vacation or Sick Leave)
Workplace TypeThis is a fully onsite position in Aiken,SC.
Application DeadlineThis position is anticipated to close on Aug 6, 2026.
About TEKsystemsWe're partners in transformation. We help clients activate ideas and